Scope One

  • (1) Expand Existing 138kV BAAH Substation
  • (1) 138kV 6 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 6 Breaker Ring Substation
  • (2) 138/35kV 80MVA Power Transformers
  • (1) Lot 35kV GIS Switchgear in Elevated PCR Type Building

Scope Two

  • (1) Expand 138kV 6BKR Ring to 8 BKR Ring Substation
  • (1) 138kV 2 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 4 Breaker Ring Substation
  • (2) 138/35kV 80 MVA Power Transformers
  • (1) Lot 35kV Metal Clad Switchgear in Cinder Block Building

Scope Three

  • (1) Expand 138kV 4 BKR Ring to 6 BKR Ring
  • (1) 138kV 2 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 4 BKR Ring
  • (2) 138/35kV 60MVA Power Transformers
  • (1) Lot 35kV Metal Clad Switchgear in Elevated PCR Type Building

Scope Four

  • (1) Expand 138kV 4 BKR Ring to 6 BKR Ring
  • (2) 138/35kV 60 MVA Power Transformers
  • (1) Lot 35kV Metal Clad Switchgear in Elevated PCR Type Building

Scope Five

  • (1) 69kV 4 BKR Ring Substation
  • (1) 69kV Transmission Line Cut-in for Three Terminal Station
  • (2) 69/15kV 60MVA Power Transformers
  • (1) Lot 15kV Metal Clad Switchgear in Elevated PCR Type Building
  • (1) Lot 15kV Insulated Power Cable Distribution Lines on steel structures approx. 6 Miles

Related Projects

2020
Delaware Basin New Mexico High Voltage Supply Project

Scope One (1) 115kV 7 Bay BAAH Switchyard (2) 115/25kV 37MVA Power Transformers (2) Lot 25kV Switchgear and PCR Type Building (1) 115kV 4 Mile...

View Project
2017
Baytown & Mont Belvieu, Texas NAG High Voltage Supply Project

Scope One (1) 138kV 4 Mile Steel Structure Dual Circuit Transmission Line (1) 138kV 4 BKR Ring Substation (2) 138/35kV 80 MVA Power Transformers (1)...

View Project