Completion Date: 2020
Location: Texas City, TX
Engineering and Construction Services:
Dashiell was awarded this project in July, 2020. The substation is an EPC (engineering, procurement, and construction) greenfield project for a 345-138kV substation. The 345kV...
View ProjectEPC Scopes: (2) – 345kV 3 breaker ring SWYD expandable to a future BAAH (1) – 115kV 3 Bay BAAH SWYD (1) – 115kV 3...
View ProjectEPC Scope: (1) – 500kV 3 breaker ring switching station (1) – 500kV Transmission Line – 6 miles (1) – 500/230kV Switching Station (3) –...