Completion Date: 2020
Location: Midland, TX
Scope One (1) 138kV 4 Mile Steel Structure Dual Circuit Transmission Line (1) 138kV 4 BKR Ring Substation (2) 138/35kV 80 MVA Power Transformers (1)...
View ProjectMultiple 138kV 4 Breaker Ring Bus Substations Includes two (2) Redundant Transformers Typically includes a Control House with a Lineup of MV SWGR for Load...