Dashiell was awarded this project in July, 2020. The substation is an EPC (engineering, procurement, and construction) greenfield project for a 345-138kV substation. The 345kV...
View ProjectEPC Scope: (3) – 230kV Generation Tie Lines including POCO switch pole (3) – 230/34.5kV Collector Substations (3 separate PPA’s) (1) – 230kV Switching Station
View ProjectEPC Scope: (2) – 138kV Generation Tie Lines (3) – 138/34.5kV Collector Substations (3 separate PPA’s) (1) – 138kV Switching Station – Build Transfer to...
View ProjectEPC Scope: (2) – 230kV Generation Tie Lines including POCO switch pole (3) – 230/34.5kV Collector Substation Full Telecom Scope including Cellular and Microwave Connections
View ProjectEngineering and Construction Services: Four (4) Bays Five (5) Lines Coming In and Out Included Current Limiting Reactors
View ProjectEPC Scopes: (2) – 345kV 3 breaker ring SWYD expandable to a future BAAH (1) – 115kV 3 Bay BAAH SWYD (1) – 115kV 3...
View ProjectEPC Scope: (1) – 500kV 3 breaker ring switching station (1) – 500kV Transmission Line – 6 miles (1) – 500/230kV Switching Station (3) –...
View ProjectEPC Scope: 400MW 500kV BESS Collection Substation – Four 34.5kV Feeder’s CAISO Metering Battery Technology Used: LG
View ProjectScope One (1) 115kV 7 Bay BAAH Switchyard (2) 115/25kV 37MVA Power Transformers (2) Lot 25kV Switchgear and PCR Type Building (1) 115kV 4 Mile...