138/12.47kV Tap Substation Includes two (2) Redundant Transformers Control House with lineup of 12.47kV SWGR 12.47kV Pole Line through the Facility Cutover of New and...
View ProjectProject Description: Dashiell provided an EPC turnkey project for a 345kV – 138kV substation as part of the Horse Hollow Generation Tie Project. The station...
View ProjectEPC Scope: 100MW 230kV BESS Collection Substation – Two (2) 34.5kV Feeder’s CAISO Metering Battery Technology Used: Fluence
View ProjectEPC Scope: 100 MW 138kV BESS Collection Substation – Four 34.5kV Feeder’s ERCOT WSL Metering Battery Technology Used: Powin Energy
View ProjectEPC Scope: Two (2) 50 MW 138kV BESS Collection Substation – Each having Two 34.5kV Feeder’s ERCOT WSL Metering Battery Technology Used: Powin Energy
View ProjectEPC Scope: 100MW 138kV BESS Collection Substation – Four 34.5kV Feeder’s ERCOT WSL Metering Battery Technology Used: Tesla Megapack