Completion Date: 2011
Location: Van Wert, Ohio
Client: Iberdrola Renewables
The Blue Creek Wind Farm is a 345kV Interconnect Switchyard owned by American Electric Power. The switching station is a three breaker ring bus (designed for future expansion into a BAAH configuration) and ties into an existing AEP 345kV Convoy to East Lima transmission line and a new 345kV transmission line to the Blue Creek Wind Project.
230kV Interconnect Switchyard 230/34.5kV Collection Substation 230kV Transmission Line
View ProjectOne 230kV, 2000A gas circuit breaker One 230kV/34.5kV 75/100/125 MVA power transformer Five 38kV, 1200A vacuum circuit breakers Two 34.5kV 10 MVAR capacitor banks
View ProjectAt Dashiell, we recognize that our success begins and ends with our employees and are always on the lookout for new candidates of all experience levels. Apply Today!
Learn MoreOur single source capability allows us to be responsive to our client's needs. Our goal is always the same - to give you a full range of cost-conscious, schedule driven, safe and quality project solutions.