Project Details

Completion Date: 2020

Location: Midland, TX

  • 138/12.47kV Tap Substation
  • Includes two (2) Redundant Transformers
  • Control House with lineup of 12.47kV SWGR
  • 12.47kV Pole Line through the Facility
  • Cutover of New and Existing Loads to the new Transmission Substation

Related Projects

2017
Baytown & Mont Belvieu, Texas NAG High Voltage Supply Project

Scope One (1) 138kV 4 Mile Steel Structure Dual Circuit Transmission Line (1) 138kV 4 BKR Ring Substation (2) 138/35kV 80 MVA Power Transformers (1)...

View Project
Completed Over the Last 50+ Years
Enterprise Customer Owned Utility Tie Subs

Multiple 138kV 4 Breaker Ring Bus Substations Includes two (2) Redundant Transformers Typically includes a Control House with a Lineup of MV SWGR for Load...