Completion Date: 2009

Location: Texas

Client: NextEra Energy

Dashiell provided an EPC turnkey project for a 345kV – 138kV substation as part of the Horse Hollow Generation Tie Project. The station consisted of a 2 breaker 345kV tap substation with a single incoming line, two (2) 555MVA 345kV – 138kV transformers and a 3 bay 138kV breaker and a half substation. The switchyard was designed as an interconnect point for the operation of a 1000MW wind park in Kendall County. 100% of the design for this station was by Dashiell, including site grading, structures, foundations, conduit, grounding, lightning protection, station lighting, control building layout and specification, electrical plans and section, installation details, protection and control single line drawings, schematics and wiring, communications/SCADA, relay control panels, relay coordination settings, and equipment specifications. Due to the critical nature of this project, Dashiell completed design and construction in 9 months, from notice to proceed.

 

 

Related Projects

2011
Blue Creek Wind Farm

345kV Interconnect Switchyard

View Project
2011
Cedar Creek II Wind Farm

230kV Interconnect Switchyard 230/34.5kV Collection Substation 230kV Transmission Line

View Project
2010
Hatchet Ridge Wind Farm

One 230kV, 2000A gas circuit breaker One 230kV/34.5kV 75/100/125 MVA power transformer Five 38kV, 1200A vacuum circuit breakers Two 34.5kV 10 MVAR capacitor banks

View Project
Back to Top